Description |
*Steps To Reproduce:*
Step 1: Make sure to Set up the System Manager> Company Configuration> Transports> Freight Cost Allocation Method based on the screenshots below:
!pastedImage_d80365_0.png|height=433,width=536! Or !pastedImage_d80365_1.png|height=427,width=533!
Step 2: Go to Transports> Transports Load> New
Step 3: Create Transports Load using:
* Origin = Terminal; Destination = Customer
* Origin = Terminal; Destination = Location
Step 4: Click Save and Post
{color:#ff0000} *Issue:* {color}
When Freight Cost Allocation Method = Bulk Plant Loads Only and Transport Load is using the combination (Origin = Terminal; Destination = Location) the "Set Allocate Cost" Field in Inventory Reciept of the created Transport Load is set to " *NULL* ".
{color:#00ff00} *Accepted:* {color}
"Set Allocate Cost" Field in Inventory Reciept of the created Transport Load should be set to " *UNIT* ".
|