Description |
*This issue relates to i21 Help Desk ticket:* [ HDTN-249680 - Ensure Contract Available and Schedule Quantities are properly updated|https://helpdesk.irely.com/iRelyi21live/#/HD/Ticket/?ticket=HDTN-249680]
Transport Load with distribution scenarios that need to fix.
1. TR Load is saved (Contract’s Schedule Quantity is increased), then Distribution Header is deleted Schedule Quantity should be reduced, and Available Quantity should be increased.
2. TR Load is saved, then Distribution Detail (where Contract is specified) is deleted same result as #1
3. TR Load is saved, then distribution Detail is modified and the Contract is removed same as #1
4. Distribution Detail is modified and a different Contract is used old Contract’s Scheduled Qty is reduced and Available Qty is increased, and the new Contract’s Scheduled is increased, and Available is decreased.
5. TR Load is deleted same as #1
Transport Load with receipt scenarios that need to fix.
1. TR Load is saved (Contract’s Schedule Quantity is increased), then Receipt is deleted Schedule Quantity should be reduced, and Available Quantity should be increased.
|