Description |
This issue relates to i21 Help Desk ticket. Click the link below to go to Help Desk ticket.
[HDTN-204524 - Replicate button on transport loads|http://helpdesk.irely.com/iRelyi21live/i21/#/HD/Ticket/?ticket=HDTN-204524]
Need a patch and a blocker release.
Reproduce steps
1. Creat a TR Receipt line. Select a Supply Point that is set to Gross. Enter thru the data points, then click Replicate. Enter thru the 2nd line.
2. In Distribution, select RL-1. Gross is pulled in.
3. In Distribution, select RL-2. This time the Net quantity is pulled in.
Correct behavior: all RL lines in Distribution should pull in what the Supply Point setup is.
|