HDTN-240030 - Direct Ship with Loads contracts

Issue No: SC-3329
Created 1/16/2020 5:04:55 PM
Type Bug
Priority Blocker
Status Closed
Resolution Fixed
Fixed Version 19.2
Description Steps:   Create a sale contract. Check the Load option.   Enter # of load e.g 30. Qty/Load = 25 Ton.   Have multiple sequences for you contract.   !pastedImage_d129043_0.png|height=616,width=1904!   Create loud out ticket where distribution type = contract. Ensure that scale weigh is greater than 25ton.   Select the contract you created. Select a specific sequence.   Manually distribute ticket.     Issue:   !pastedImage_d129043_1.png|height=776,width=1025!   +Acceptance+:   Entire ticket quantity should default to the selected sequence.         This issue relates to i21 Help Desk ticket. Click the link below to go to Help Desk ticket.   [HDTN-240030 - Direct Ship with Loads contracts |https://helpdesk.irely.com/iRelyi21live//#/HD/Ticket/?ticket=HDTN-240030]     When Distributing to Load Contract 58 (Sale Contract), even though it's a load contract the quantity is being split.     +Example+:   # Pricing of each sequence is 25 ton, # ticket is 26.41 tons # On manual distribution screen, 25 tons went to the selected sequence and the .41 went to a different sequence.