M2M configuration

Issue No: RM-612
Created 1/16/2017 4:54:18 AM
Type Feature
Priority Minor
Status Closed
Resolution Fixed
Fixed Version 17.1
Description This issue relates to i21 Help Desk ticket. Click the link below to go to Help Desk ticket.   [ - M2M configuration|http://helpdesk.irely.com/iRelyi21live/i21/#/HD/Ticket/?ticket=] 1- create a new configuration for M2M   2- for each INCO term, provide a list of all the items of the type "Other charge" as rows   3- Provide a column next to the item - call it adjustment - It will be a dropdown with 2 options - Add / Reduce . By default neither should be selected.   4- This will impact the cost calculation in M2M cost column   5- if any costs for which adjustment is specified in this screen is associated with the sequence, M2M will know what to do with that cost in M2M screen.   6- We already have this logic but currently it works based on M2M check box being checked , the sign of the number (negative means reduce and poistive means add)