Description |
STEPS
1. Create Load in Open Storage = 49.98
2. Create Load in Open Storage = 34.15
3. Create Delivey Sheet and link the 2 tickets
4. Distribute Delivery Sheet
5. Create Settlement for Full qty
ISSUE
The Inhouse became 168.26
On storage is still showing 84.13
ACCEPTED
In house should show 84.13
On Storage should show 0
|