Ensure the TR SPs fetch values from the right places

Issue No: MFT-1354
Created 11/15/2018 10:40:52 AM
Type Bug
Priority Blocker
Status Closed
Resolution Fixed
Fixed Version 19.1
Description + *Steps:* +   1. Create Terminal to Location , Terminal to Customer Transport Load and Location to Customer Transport Load and post.   2. Run OR Schedule 3 Gasoline (to Bulk)   3. Export to Excel   4. Check Destination Facility No   {color:#ff0000}+ *Issue 1:* +{color}   Shows blank:   !pastedImage_d108138_0.png!   5. Run OR Schedule 3 Gasoline   6. Export to Excel   {color:#ff0000}+ *Issue 2:* +{color}   Incorrect Seller ID and Seller Name shows:   !pastedImage_d108138_1.png!   {color:#008000}+ *Acceptance:* +{color}   1. Destination Facility Number should pull in from Company Location > Setup > Oregon Facility No.   2. When TR Load > Receipt is Vendor, Seller ID and Seller Name should be pulled from Vendor When TR Load > Receipt is Location, Seller ID and Seller Name should be pulled from Company Configuration screen → System Manager area → Company Setup area → Company Name   ===========================================================================================================================   *{color:#ff0000}Please include script in this JIRA.{color}*   For the three new TR SPs:   * Origin Information (such as Origin City, State, OR Facilty Number, etc) is from the TR Load's Receipt ** If Vendor, then Vendor's Supply Point. ** If Location, then Bulk Plant. ** Each Receipt line should be treated separately (that is, RL-1 can be from a Vendor while RL-2 can be from a Location). * Destination (such as Destination city, State, OR Fac Number etc) is from the TR Load's Distribution Header ** If Customer, then Customer's Ship To Location. ** If Location, then Bulk Plant ** Each Distribution Header should be treated separately   In addition. on [http://inet.irelyserver.com/display/MFT/SP+Rules] , I defined sources for Seller, Buyer, Carrier, and Consignor:   !pastedImage_d108138_2.png|height=565,width=1127!