Description |
*Steps:*
1. Go to Manufacturing > Maintenance > Production Calendar
2. Click New button.
*Issue:*
Unable to select a Production Line even though there are existing records. Error in console is displayed.
!IRE-T3762 Issue.gif|height=270,width=553!
*Acceptance:*
Should be able to select an existing Production Line.
|