Load / Shipment Schedule - In the Shipping Instruction the Planned Availability date is not calculated and displayed correctly based on Act ETA” plus the Leadtime at Destination port

Issue No: LG-3371
Created 4/29/2022 3:43:23 AM
Type Bug
Priority Critical
Status Closed
Resolution Fixed
Fixed Version 21.2
Description *This issue relates to i21 Help Desk ticket:* [ HDTN-272526 - PLANNED AVAILABILITY DATE is not linked with ACT ETA in I21 correctly|https://helpdesk.irely.com/iRelyi21live/#/HD/Ticket/?ticket=HDTN-272526]   Reproducible in the T3 environment     Steps:   # In the contract {color:#002060}1005390.66-1 {color}the Destination port is Bremen for which in the City master the Leadtime at destination port is configured as 14 days # From the contract create the Shipping Instruction (LSI) and enter the Act ETA as 25/06/2022     Issue:   In the LSI screen the Planned Availability date is showing same as Act ETA 25/06/2022 which is wrong. While it should recalculate and display correctly based on the “Act ETA” plus the Leadtime at Destination port as 09/07/2022 which is showing correctly in the contract sequence.   Planned Availability date = Act ETA + Lead time at destination port   = 25/06/2022 + 14 days   = 09/07/2022     Acceptance:   In the LSI screen the Planned Availability date should recalculate as Act ETA + Lead time at destination port when the ACT ETA is entered