Description |
*This issue relates to i21 Help Desk ticket:* [ HDTN-272526 - PLANNED AVAILABILITY DATE is not linked with ACT ETA in I21 correctly|https://helpdesk.irely.com/iRelyi21live/#/HD/Ticket/?ticket=HDTN-272526]
Reproducible in the T3 environment
Steps:
# In the contract {color:#002060}1005390.66-1 {color}the Destination port is Bremen for which in the City master the Leadtime at destination port is configured as 14 days
# From the contract create the Shipping Instruction (LSI) and enter the Act ETA as 25/06/2022
Issue:
In the LSI screen the Planned Availability date is showing same as Act ETA 25/06/2022 which is wrong. While it should recalculate and display correctly based on the “Act ETA” plus the Leadtime at Destination port as 09/07/2022 which is showing correctly in the contract sequence.
Planned Availability date = Act ETA + Lead time at destination port
= 25/06/2022 + 14 days
= 09/07/2022
Acceptance:
In the LSI screen the Planned Availability date should recalculate as Act ETA + Lead time at destination port when the ACT ETA is entered
|