For an unlimited contract if we already generated a load more than the initial contract qty, a 2nd load is not able to create for the same contract though the existing load qty can be increased further: -

Issue No: LG-217
Created 9/8/2015 7:01:05 AM
Type Bug
Priority Major
Status Closed
Resolution Fixed
Fixed Version 15.4
Description # Unlimited Contract Qty = 1000 bag. # Able to create load schedule more than this qty e.g. 1200 bag. # Unlimited contract qty became 1200 bag. # We can increase the load qty e.g. 1200 to 1500 in this same load. # And then contract qty again changed from 1200 to 1500 bag. # {color:red}But, we are unable to create a 2{^}nd{^} load for the same contract.{color} # {color:red}This time contract drop down of *load schedule screen or generate load screen* are not showing the same contract number anymore.{color} # {color:red}Hence, not able to create the 2{^}nd{^} load against the same contract.{color}