Description |
On the Load Schedule Costs tab, populate the Costs tab with the contract sequence Costs.
Contract with sequence 1 costs for Freight and Brokerage.
!pastedImage_d42296_0.png!
Costs on the Load Schedule should have the Cost from the contract by default with the ability for the user to add/change them.
!pastedImage_d42296_1.png!
|