Description |
Scenario -
Create load based contract for 4 25Ton Loads.
Generate 4 loads.
At that point, the Scheduled qty is 100Ton, Available 0.
Open one of the scheduled loads and change the qty from 25T to 20T
The result is that the scheduled qty went down by 25T, but the load is still connected to contract. The scheduled loads is still 4 but also shows 1 available.
System should not let user adjust the qty on a load connected to a load based contract. OR it needs to properly handle it on the contract balances.
!pastedImage_d107043_0.png!
|