Description |
When a Load Schedule is connected to a Load Contract, if the quantity is changed, do not update the scheduled balance on the contract. For Load Contracts, the qty applied does not matter. Currently, the scheduled balance is being updated which is preventing the scale ticket from being distributed.
+Steps+:
Create Sale Load contract for three loads, 330 per load. save
Create Load scheduled for the three loads (three LS), save
Review scheduled and available loads on the contract.
Open one of the Load Scheduleds and change the quantity on the detail line to 110 instead of 330. Save
Review sceduled and available loads on the contract.
!pastedImage_d110886_0.png!
+Acceptance+:
Changing the quantity on a LS attached to a Load Contract should not change the contract scheduled.
If a LS is created against a Load Contract, the scheduled will increase by 1
If a LS is deleted against a Load Contract, it will reduce the scheduled by -1
|