Load Shipment Schedule - provide a mechanism for CT to change the sequence location

Issue No: LG-1120
Created 7/31/2017 3:36:00 AM
Type Paid
Priority Blocker
Status Closed
Resolution Fixed
Fixed Version 17.1
Description This issue relates to i21 Help Desk ticket. Click the link below to go to Help Desk ticket.   [HDTN-201167 - Contract - Allow location at the sequence to be changed|http://helpdesk.irely.com/iRelyi21live/i21/#/HD/Ticket/?ticket=HDTN-201167] * Currently when the contract is created with multiple sequences, we do not allow the user to change the locaiton if the "Multiple Price" checkbox is checked * JDE needs this flexibility to change the location * For e.g. they might have created a contract with 3 sequences all with Utrecht as the location. However later they may assign sequence 2 to Zug office * This flexibility is required since each office is responsibile for monitoring and performing their location's logistics activities * Provide a SP that CT call whenever the location is changed for any sequence with Shipping Instructions (e.g LSI) and Shipping advices (e.g. LS).