Description |
1. Create a receipt and enter Manufacturing date in lot grid post this
2. The created lot is calculating the expiry date based on the lot create date ( current date)
3. Application should calculate based on the Manufacturing Date.
4. When Manufacturing date is not available then this should be calculated from Lot create date
For example if a lot is manufactured six month ago, the expiry date should be calculated since that date.
!pastedImage_d66003_0.png!
|