scale remove load option

Issue No: GRN-131
Created 6/10/2015 2:49:54 PM
Type Feature
Priority Major
Status Closed
Resolution Fixed
Fixed Version 15.3
Description New distribution type of "Load"   Distribution program and scale have to understand load as a type, which is only set if load is selected.   if distribution type is changed from load, then we must pop a message asking "Load is used, remove the current load and contract from this ticket?" yes/no.   Hold is the only other valid type which means save existing settings as possible distrubution later.