Description |
STEPS
1. Run the Report as of 8/31/2015
!pastedImage_d42808_0.png!
2. Create a GJ and post on the date (8/31/2015)
!pastedImage_d42808_1.png!
3. Run the Same report for the same as of date
ISSUE
It does not increase the amount in the report.
ACCEPTED
Should be the same value as shown in the GL Account Detail
!pastedImage_d42808_2.png!
|