Description |
Steps:
1. Create Purchase Basis Contract
- QTY =15,000
- Lots = 150
2. Price and Hedge Contract- Full Price
3. Click Save
4. Slice Contract to 2 sequence
- Sequence 1 is 1000 (10 Lots)
- Sequence 2 is 14000 (140)
5. Check assign derivative - Incorrect lots after sliced
Issue:
!pastedImage_d171972_0.png|height=466,width=1096!
Accepted:
Assigned derivative screen should display the correct hedge lots and should match in the Derivative Entry screen
|