21.1 - Incorrect hedge lots in Assigned Derivatives screen after slicing the contract.

Issue No: CT-6327
Created 10/18/2021 10:52:04 PM
Type Bug-QC
Priority Critical
Status Closed
Resolution Fixed
Fixed Version 21.1
Description Steps:   1. Create Purchase Basis Contract   - QTY =15,000   - Lots = 150   2. Price and Hedge Contract- Full Price   3. Click Save   4. Slice Contract to 2 sequence   - Sequence 1 is 1000 (10 Lots)   - Sequence 2 is 14000 (140)   5. Check assign derivative - Incorrect lots after sliced     Issue:   !pastedImage_d171972_0.png|height=466,width=1096!     Accepted:   Assigned derivative screen should display the correct hedge lots and should match in the Derivative Entry screen