Description |
Steps
# Create HTA contract with 10000 qty (single sequence)
# Save contract
# Slice contract into 2 (Seq1 = 6000, Seq2 = 4000).
# Click on Slice. Don't save the contract after slice.
# Edit both sequence and price them manually.
# Save Contract
Issue: Logs only show slicing of 1st sequence and then pricing of 2nd sequence
Price fixation is not posted to DPR summary Log correctly when the contract 6460 -1 was sliced to 5000 Bushels from 7000 bushels and 2000 bushels were moved to Seq1.
Also when both the sequence status is priced Seq 1 is listed with price type as Basis in Contract Balance report.
!pastedImage_d170902_0.png|height=512,width=1072!
Find the DPR summary log extract from Zeeland TE environment attached
Acceptance:
!pastedImage_d170902_1.png|height=356,width=362!
|