[Contract Balance] - Wrong Balance on DPR

Issue No: CT-3581
Created 8/6/2019 1:30:40 PM
Type Bug
Priority Blocker
Status Closed
Resolution Fixed
Fixed Version 19.1, 19.2
Description This issue relates to i21 Help Desk ticket. Click the link below to go to Help Desk ticket.   [HDTN-234281 - Contract balance is wrong on DPR|https://helpdesk.irely.com/iRelyi21live//#/HD/Ticket/?ticket=HDTN-234281]     Steps:   # Create Sales Load Based Basis Contract # Add 1 sequence # Save # Open seq 1 and change load lower than the original no of loads   # Insert a new sequence 2 for the remaining loads   # Save   # Price the sequences   # Shipped 1st sequence and received   # Shipped half of the # of loads of the 2nd sequence (Qty shipped is bigger than the actual # of loads)   # Receive   # Check balance     Issue: Balance qty is reduced by the actual shipped qty and not by the equal qty per load   Acceptance: Balance should show the qty equal to the remaining qty per load.