Description |
This issue relates to i21 Help Desk ticket. Click the link below to go to Help Desk ticket.
[HDTN-234281 - Contract balance is wrong on DPR|https://helpdesk.irely.com/iRelyi21live//#/HD/Ticket/?ticket=HDTN-234281]
Steps:
# Create Sales Load Based Basis Contract
# Add 1 sequence
# Save
# Open seq 1 and change load lower than the original no of loads
# Insert a new sequence 2 for the remaining loads
# Save
# Price the sequences
# Shipped 1st sequence and received
# Shipped half of the # of loads of the 2nd sequence (Qty shipped is bigger than the actual # of loads)
# Receive
# Check balance
Issue: Balance qty is reduced by the actual shipped qty and not by the equal qty per load
Acceptance: Balance should show the qty equal to the remaining qty per load.
|