CLONE - Ticket application is rolling to the next contract on Load Based

Issue No: CT-2608
Created 10/9/2018 7:06:24 AM
Type Bug-QC
Priority Blocker
Status Closed
Resolution Fixed
Fixed Version 18.3
Description Scenario - Manual Distribution   Create Load based contract for 4 25Ton Loads   # Generate 4 loads (Load schedules) # Ship first load at 26T # Ship second load at 27T # Ship third load at 22T # Ship fourth load at 29T   Not able to distribute the Last load.   Expectation: Should be able to distibute load.