Description |
Scenario -
Create Load based contract for 4 25Ton Loads
# Generate 4 loads (Load schedules)
# Ship first load at 26T
# Ship second load at 27T
# Ship third load at 22T
# Ship fourth load at 29T
The contract balance is correctly adjusting for each load (reducing contract by only 25T) and the invoices are correct, unti the last one. When the contract qty exceeds 100T, it is rolling to another contract. With Load based contracts, Every load gets applied to the contract, regardless of quantity.
|