Description |
# If load contract button is selected
## Gray out the quantity and uom on the contract header
## Make the quantity on the contract = the number of loads X quantity per load (quantity will be used for Risk)
## Sync the unit of measures - when load checkbox is selected then the Qty and UOM fields on the contract should be grayed out
!pastedImage_d92210_0.png!
|